GROUND TRUTH: ASSESSING THE NEKEDE OLD ROAD BORROW PIT—IMPLICATIONS FOR SUSTAINABLE INFRASTRUCTURE AND ENVIRONMENTAL CONSERVATION
Abstract
This study presents a comprehensive geo-technical assessment of the Nekede Old Road Borrow Pit, exploring its implications for sustainable infrastructure development and environmental conservation. Through rigorous soil analysis, geological investigations, and environmental impact assessments, the research sheds light on the physical properties of the borrow pit and its potential effects on nearby ecosystems. The findings offer valuable insights for informed decision-making in construction projects, emphasizing the importance of sustainable practices for both infrastructure development and environmental preservation.
Keywords
Geo-Technical Assessment, Borrow Pit, Infrastructure Development
References
Aesthetics/Visual Resources Impact Assessment, AVRIA. Southern California International Gateway Draft EIR, 2013. Available online at http://www.portoflosangeles.org accessed 15th, June.
Agriculture and Resource Management Council of Australia and New Zealand, ARMC. Minimum construction requirements for water bore in Australia in Avbovbo AA. Tertiary Iithostratigraphy of the Niger Delta. Am. Assoc. Petrol. Geol. Bull. 1978-1998; 62:295-306.
Australian Mining Industry Council, AMIC. Mine Rehabilitation Handbook. Canberra ACT, 1989. 2600 @ http://www.ag.gov.au/cca
Ashraf MA, Mohd. JM, Ismail Y, Abdul W, Karamat M.
Sand mining effects, causes and concerns: A case study from Bestari Jaya, Selangor, Peninsular Malaysia, 2011. ISSN 1992- 2248 ©2011 Academic Journals. Available online at http://www.academicjournals.org/SRE
Colorado Geological Survey, CGS. Landslides in Colorado, 2013. Available online at http://www.geosurvey.state.co.us accessed 14th, June, 2013.
Etuonovbe AK. Economic Benefit of Hydrography: Land Reclamation in Bayelsa State: A Case Study of Saipem Camp. Strategic Integration of Surveying Services FIG Working Week 2007 Hong Kong SAR, China, 2007.
Federal Department of Agriculture and Land Resources, FDALR. Technical Report on erosion and wetland of south-eastern Nigeria, 1980.
Forth HD, Turk LM. Fundamental of soil science (5th ed.) John Wiley and Sons Inc. USA. 1972, 348-355.
Fortescue Metal Group. FMG. Pilbara Iron Ore Project, Draft Borrow Bit Rehabilitation Procedure, 2004. Available online at http://www.epa.wa.gov.au accessed 15th, June, 2013.
Hardy Bartle. B.C.’s Watershed Restoration Technical Bulletin, streamline journal, 2007, 6. E- mail:Hardy.Bartle@gems5.gov.bc.ca
Jencie M, Robinson P, Giummarra G. Environmental Best Practice for Outback Roads Guidelines for Transport SA RC 90165-4, 2000.
Article Statistics
Downloads
Copyright License
Copyright (c) 2023 Adesina Bankole
This work is licensed under a Creative Commons Attribution 4.0 International License.